Jobs Career Advice Post Job
X

Send this job to a friend

X

Did you notice an error or suspect this job is scam? Tell us.

Oops! It seems this job from Ekklesiyar Yan'uwa a Nigeria (EYN PROJECT) has expired
View current and similar jobs using the button below
  • Posted: Oct 10, 2024
    Deadline: Oct 13, 2024
    • @gmail.com
    • @yahoo.com
    • @outlook.com
  • EYN Projects respects and believes in the infinite worth of every individual. We demonstrate this belief through our development and humanitarian services to affected communities, equal employment opportunities, building and strengthening staff's skills, and ensuring qualitative and effective service delivery. EYN Projects does not discriminate based on gender, ethnicity, or religion in our recruitment exercise nor in our humanitarian and development work.
    Read more about this company

     

    Request for Quotes (RFQ) for the Supply of 5 Bore-Hole Rehabilitation in Mafa LGA

    EYN Projects in partnership with Christian Aid is implementing a WASH Integrated livelihood Initiative Support to improve food security la LGA, Borno state, North east Nigeria. 

    RE-REQUEST FOR QUOTES (RFQ) FOR THE SUPPLY OF 5 BORE-HOLE REHABILITATION IN MAFA LGA, BORNO STATE 

    “ RFQ N0:  EYNPN/CAID/MAFA/WASH/SEPT/2024/809 “SUPPLY OF BOREHOLE REHABILITATION SERVICE ” 

    CLOSING DATE: 13th OCTOBER 2024, 5:00 PM 

    LOCATION: MAFA LGA, BORNO STATE 

    WATER POINT 1 

      BOQ FOR THE REHABILITATION OF BAKIN IDP SOLAR POWERED BOREHOLE IN MAFA LGA, BORNO STATE, NIGERIA. 
      DESCRIPTION OF WORKS  UNIT  QUANTITY   COST   TOTAL COST 
    Mobilization and Demobilization (Establishment of a base Station): Mobilization of all necessary materials, equipment, and all personnel to the base station for site clearance, borehole developments, pumping test and recovery tests, civil works, and installation of motorized pumps; including demobilization of all Plants, Equipment's and all resources from sits upon completion of installation works.  Lumpsum     
    Allow for data analysis and writing reports (Borehole completion reports, pump test report, installation report) in two hard copies and 1 electronic copy.  Lumpsum                                                       -   
      Total carried to summary: MOBILIZATION         

                                                                           

      CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL 
    EARTH WORK         
    Site Clearance: Clear and and remove all trees, shrubs, and obstacle to be disposed 100m away from the site.  m2  24.5                                                       -   
    Excavate for the Foundation to receive concrete work not exceeding 700mm depth  m3  5.23                                                       -   
    Backfilling  to the sides of the excavated foundation  m3  1.87                                                       -   

     

     

      footing using selected excavated materials to achieve maximum compaction ratio.         
    Remove surplus excavated material away from the site  m3  0.93                                                       -   
    Excavation of soak pitnot exceeding 1.5m from natural ground level as specified on the drawings  m3  17.85                                                       -   
    Provide hardcore material to the floor site of the water point  m2  9.4                                                       -   
      SUBTOTAL                                             -   
    CONCRETE WORK         
    Provide and place 50mm thick plain concrete to ratio 1:3:6 grade 10 for foundation trench as specified on the drawing and specification.  m3  0.85                                                       -   
    Plastering/Rendering of water point using ratio 1:3  m2  11.25                                                       -   
    Ditto: Apron  m3  5.66                                                       -   
     Provide mass concrete to the ramp using ratio 1:3:6  m3                   0.27                                                       -   
    Reinforced concrete cover slab to ratio 1:2:4 grade 15  m3  0.26                                                       -   
    Ditto: Apron  m2  0.5                                                       -   
      SUBTOTAL                                             -   
    REINFORCEMENT         

         

    High yield steel deformed bars to BS4449         

         

    Provide and fixed Y 12mm Ø reinforcement bar for soak pit slab  Kg  37                                                       -   

         

    Binding wire  Kg                                                       -   
      SUBTOTAL                                             -   
     D  FORMWORK         

         

     Provide 2"x4" hard wood timber to the sides of slab   pcs                   4.80                                                       -   

         

     3" assorted nails   kg                   1.00                                                       -   
      SUBTOTAL                                             -   
    MASONRY WORK         
     Provide and lay 230mm thick hollow blocks of 1:3 mix ratio  enbedded and jointed to cement sand mortar(1:4) to the perimeter and Apron of the water point ncluding ramp and 3 metre drainage channel connecting collection point and soak pit  m2                 17.92                                                       -   
     Sand cement plastering/rendering of 20mm thick,  m2                 12.87                                                       -   
      finished smooth: To internal & external fence walls.         
     Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the soak pit allowing maximum of 3 opening to sides of the pit for proper seapage  m2                 14.20                                                       -   
     50mm thick concrete blinding to ratio 1:3:6 grade 10 for soak pit  m3                   0.31                                                       -   
     Block fill the block using week concrete  m3                   2.24                                                       -   
      SUBTOTAL                                             -   
    STEEL WORK         
    Provide and fixed 1 1/4" diameter pure black circular hand rail to the both sides of the ramp as shown on the drawing                 29.20                                                       -   
      SUBTOTAL                                             -   
     Plumbing work         
    Provide and fix UPVC 1" UPVC tigger elbow   Nr                         2                                                       -   
    Provide and fix 3/4" steel tap head England made or as specified by the engineer   Nr                         6                                                       -   
     Provide and fix 3/4" UPVC tigger nipple   Nr                         6                                                       -   
    Provide and fix 3/4" UPVC tigger socket   Nr                         6                                                       -   
    Provide and fix  1" by 3/4" Bushing England made or as specified by the engineer   Nr                         6                                                       -   
     Provide and fix 1" UPVC tigger pipe in the collection point and extend aleast 2m away from the collection point   Nr                         2                                                       -   
     Provide and fix 1" UPVC stop cork regulator at the collection point   Nr                         1                                                       -   
      SUBTOTAL                                             -   

    Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND 

    RAIL 

                                           -   
      Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL FOR 2 UNITS                                           -   
    BOQ: For Solar Installation 5.5 Watts System  

                                   1     Solar Pump Sq 2-2-5                                                                                     1                            1                        

    Supply and Install 3M scotch cast Cable jointing kit & earthing  Set                                                       -   
    Tiles 40/40  20mtr  20       
    Supply & Install Support Structure and frame for panels as in TSS  NR                                                         -   
    Supply and Install 3X6mm2 pump motor cables  Set                                                         -   
    Supply and Install 4mm2 inter-connector cables  Set                                                         -   
    Supply and Install High pressure 2" PVC riser piping (8bar) for pump installation  45                                                         -   
    Supply and Install  level switch  Set                                                         -   
    Provide and fix 16mm Marine rope to secure the pump  meter  45                                                         -   
    10  Provide or construct a chamber as protector at the well head to secure the pump from vandalIzation. This can be in form of concrete or steel as specified by the engineer  Lumpsum                                                         -   
    11  Provide and install 6 feet copper earthen rod  Piece    1.0                                                       -   
    12  Provide and install  copper lightening arrester  Piece    1.0 
    13 

    Provide and fix 16mm lex of 15m length (made in 

    Nigeria) 

    Roll    1.0 
    14  Provide and fix scrotch cast connection for the borehole cable  Piece    1.0 
    15  Provide and fix adjustable strap for cable tightening  pack    1.0 
    16  Provide and fix 16m cable lock  Piece    1.0 
    17  Tank 3000 litres  Piece       
      Sub Total                                                            -   
    Summary – Mobilization       
    Summary - Construction of water collection point with ramp and rail for 3 units                                           -   
    Summary - Solar Installation 1,150 Watts System                                           -   
    Summary - Anti-theft Mechanism on Wellbore                                           -   
    Total                            -   

     

    WATER POINT 2 

    BOQ FOR THE REHABILITATION OF TOKULORI SOLAR POWERED BOREHOLE IN MAFA LGA, BORNO STATE, NIGERIA. 
      DESCRIPTION OF WORKS  UNIT  QUANTITY   COST   TOTAL COST 
    Mobilization and Demobilization (Establishment of a base Station): Mobilization of all necessary materials, equipment, and all personnel to the base station for site clearance, borehole developments, pumping test and recovery tests, civil works, and installation of motorized pumps; including demobilisation of all Plants, Equipment's and all resources from sits upon completion of installation works.  Lumpsum     
    Allow for data analysis and writing reports (Borehole completion reports, pump test report, installation report) in two hard copies and 1 electronic copy.  Lumpsum   

                                           

    -   

      Total carried to summary: MOBILIZATION         
    CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL 
    EARTH WORK         
    Site Clearance: Clear and and remove all tress, shrubs, and obstacle to be disposed 100m away from the site.  m2  24.5   

                                           

    -   

    Excavate for the Foundation to receive concrete work not exceeding 700mm depth  m3  5.23   

                                             

    -   

    Backfilling   to the sides of the excavated foundation footing using selected excavated materials to achieve maximum compaction ratio.  m3  1.87   

                                           

    -   

    Remove surplus excavated material away from the site  m3  0.93   

                                           

    -   

    Excavation of soak pitnot exceeding 1.5m from natural ground level as specified on the drawings  m3  17.85   

                                           

    -   

    Provide hardcore material to the floor site of the water point  m2  9.4   

                                           

    -   

      SUBTOTAL                                          -   
    CONCRETE WORK         
    Provide and place 50mm thick plain concrete to ratio 1:3:6 grade 10 for foundation trench as specified on the drawing and specification.  m3  0.85   

                                           

    -   

    Plastering/Rendering of water point using ratio 1:3  m2  11.25                                           

     

              -   
    Ditto: Apron  m3  5.66   

                                             

    -   

     Provide mass cocrete to the ramp using ratio 1:3:6  m3 

     

    0.27 

     

     

                                             

    -   

    Reinforced concrete cover slab to ratio 1:2:4 grade 15  m3  0.26   

                                             

    -   

    Ditto: Apron  m2  0.5   

                                             

    -   

      SUBTOTAL                                          -   
    REINFORCEMENT         

         

     

    High yield steel deformed bars to BS4449 

           

         

     

    Provide and fixed Y 12mm Ø reinforcement bar for soak pit slab 

    Kg  37   

                                             

    -   

         

     

    Binding wire 

    Kg   

                                             

    -   

      SUBTOTAL                                          -   
     D  FORMWORK         

         

     

     Provide 2"x4" hard wood timber to the sides of slab 

     pcs 

     

    4.80 

     

     

                                             

    -   

         

     

     3" assorted nails 

     kg 

     

    1.00 

     

     

                                             

    -   

      SUBTOTAL                                          -   
    MASONRY WORK         
     Provide and lay 230mm thick hollow blocks of 1:3 mix ratio  enbedded and jointed to cement sand mortar(1:4) to the perimeter and Apron of the water point ncluding ramp and 3 metre drainage channel connecting collection point and soak pit  m2 

     

    17.92 

     

     

                                             

    -   

     Sand cement plastering/rendering of 20mm thick, finished smooth: To internal & external fence walls.  m2 

     

    12.87 

     

     

                                             

    -   

     Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the soak pit allowing maximum of 3 opening to sides od the pit for proper seapage  m2 

     

    14.20 

     

     

                                             

    -   

     50mm thick concrete blinding to ratio 1:3:6 grade 10 for soak pit  m3 

     

    0.31 

     

     

                                             

    -   

     Block fill the block using week concrete  m3 

     

    2.24 

     

     

                                             

    -   

     

      SUBTOTAL                                          -     
    STEEL WORK           
    Provide and fixed 1 1/4" diameter pure black circular hand rail to the both sides of the ramp as shown on the drawing 

     

    29.20 

     

     

                                           

    -   

     
      SUBTOTAL                                          -     
     Plumbing work           
    Provide and fix UPVC 1" UPVC tigger elbow   Nr 

     

     

     

                                           

    -   

     
    Provide and fix 3/4" steel tap head England made or as specified by the engineer   Nr 

     

     

     

                                           

    -   

     
     Provide and fix 3/4" UPVC tigger nipple   Nr 

     

     

     

                                           

    -   

     
    Provide and fix 3/4" UPVC tigger socket   Nr 

     

     

     

                                           

    -   

     
    Provide and fix  1" by 3/4" Bushing England made or as specified by the engineer   Nr 

     

     

     

                                           

    -   

     
     Provide and fix 1" UPVC tigger pipe in the collection point and extend aleast 2m away from the collection point   Nr 

     

     

     

                                           

    -   

     
     Provide and fix 1" UPVC stop cork regulator at the collection point   Nr 

     

     

     

                                           

    -   

     
      SUBTOTAL                                          -     
    Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL                                      -     
      Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL FOR 2 UNITS                                        -     
    BOQ: For Solar Installation 1,150 Watts System   
    Supply and Install pump type SQ flex (1.5 Hp) determined by yield and depth of installation  Set   

                                           

    -   

     
    Supply and Install 3M scotch cast Cable jointing kit & earthing  Set   

                                           

    -   

     
               
    Supply & Install Support Structure and frame for panels as in TSS  NR   

                                           

    -   

     
    Supply and Install 3X6mm2 pump motor cables  Set   

                                           

    -   

     
    Supply and Install 4mm2 inter-connector cables  Set   

                                           

    -   

     
      Supply and Install High pressure 2" PVC riser piping (8bar) for pump installation  45     

                                           

    -   

      Supply and Install  level switch  Set     

                                           

    -   

      Provide and fix 16mm Marine rope to secure the pump  meter  45     

                                           

    -   

      10  Provide or construct a chamber as protector at the well head to secure the pump from vandalIzation. This can be in form of concrete or steel as specified by the engineer  Lumpsum     

                                           

    -   

      11  Provide and install 6 feet copper earthen rod  Piece    1.0   

                                           

    -   

      12  Provide and install  copper lightening arrester  Piece    1.0 
      13  Provide and fix 16mm lex of 15m length (made in Nigeria)  Roll    1.0 
      14  Provide and fix scrotch cast connection for the borehole cable  Piece    1.0 
      15  Provide and fix adjustable strap for cable tightening  pack    1.0 
      16  Provide and fix 16m cable lock  Piece    1.0 
        Sub Total         

                                           

    -   

      Anti-theft Mechanism on Wellbore       
      Provide visibility of the sponsors to the project  Lp     

                                           

    -   

      Provide or construct a chamber as protector at the well head to secure the pump from vandalization. This can be in form of concrete or steel as specified by the engineer  Lumpsum     

                                           

    -   

        Sub Total Fenching                                            -   
      Summary – Mobilization                                          -   
      Summary - Construction of water collection point with ramp and rail for 3 units                                          -   
      Summary - Solar Installation 1,150 Watts System                                          -   
      Summary - Anti-theft Mechanism on Wellbore                                          -   
      Total                            -   
                               

     

    WATER POINT 3 

      BOQ FOR THE REHABILITATION OF KOLTABUL SOLAR POWERED BOREHOLE IN MAFA LGA, BORNO STATE, NIGERIA. 
      DESCRIPTION OF WORKS  UNIT  QUANTITY   COST   TOTAL COST 
    Mobilization and Demobilization (Establishment of a base Station): Mobilization of all necessary materials, equipment, and all personnel to the base station for site clearance, borehole developments, pumping test and recovery tests, civil works, and installation of motorized pumps; including demobilization of all Plants, Equipment's and all resources from sits upon completion of installation works.  Lumpsum     
    Allow for data analysis and writing reports (Borehole completion reports, pump test report, installation report) in two hard copies and 1 electronic copy.  Lumpsum   

                                                     

    -   

      Total carried to summary: MOBILIZATION         
      CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL 
    EARTH WORK         
    Site Clerance: Clear and and remove all tres, shrubs, and obstacle to be disposed 100m away from the site.  m2  24.5   

                                                     

    -   

    Excavate for the Foundation to receive concrete work not exceeding 700mm depth  m3  5.23   

                                                     

    -   

    Backfilling  to the sides of the excavated foundation footing using selected excavated materials to achieve maximum compaction ratio.  m3  1.87   

                                                     

    -   

    Remove surplus excavated material away from the site  m3  0.93   

                                                     

    -   

    Excavation of soak pitnot exceeding 1.5m from natural ground level as specified on the drawings  m3  17.85   

                                                     

    -   

    Provide hardcore material to the floor site of the water point  m2  9.4   

                                                     

    -   

      SUBTOTAL                                             -   
    CONCRETE WORK         
    Provide and place 50mm thick plain concrete to ratio 1:3:6 grade 10 for foundation trench as specified on the drawing and specification.  m3  0.85   

                                                     

    -   

     

    Plastering/Rendering of water point using ratio 1:3  m2  11.25   

                                                     

    -   

    Ditto: Apron  m3  5.66   

                                                     

    -   

     Provide mass concrete to the ramp using ratio 1:3:6  m3 

     

    0.27 

     

     

                                                     

    -   

    Reinforced concrete cover slab to ratio 1:2:4 grade 15  m3  0.26   

                                                     

    -   

    Ditto: Apron  m2  0.5   

                                                     

    -   

      SUBTOTAL                                             -   
    REINFORCEMENT         

         

    High yield steel deformed bars to BS4449         

         

    Provide and fixed Y 12mm Ø reinforcement bar for soak pit slab  Kg  37   

                                                     

    -   

         

    Binding wire  Kg   

                                                     

    -   

      SUBTOTAL                                             -   
     D  FORMWORK         

         

     Provide 2"x4" hard wood timber to the sides of slab   pcs 

     

    4.80 

     

     

                                                     

    -   

         

     3" assorted nails   kg 

     

    1.00 

     

     

                                                     

    -   

      SUBTOTAL                                             -   
    MASONRY WORK         
     Provide and lay 230mm thick hollow blocks of 1:3 mix ratio  enbedded and jointed to cement sand mortar(1:4) to the perimeter and Apron of the water point ncluding ramp and 3 metre drainage channel connecting collection point and soak pit  m2 

     

    17.92 

     

     

                                                     

    -   

     Sand cement plastering/rendering of 20mm thick, finished smooth: To internal & external fence walls.  m2 

     

    12.87 

     

     

                                                     

    -   

     Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the soak pit allowing maximum of 3 opening to sides od the pit for proper seapage  m2 

     

    14.20 

     

     

                                                     

    -   

     50mm thick concrete blinding to ratio 1:3:6 grade 10 for soak pit  m3 

     

    0.31 

     

     

                                                     

    -   

     

     Block fill the block using week concrete  m3 

     

    2.24 

     

     

                                                     

    -   

      SUBTOTAL                                             -   
    STEEL WORK         
    Provide and fixed 1 1/4" diameter pure black circular hand rail to the both sides of the ramp as shown on the drawing 

     

    29.20 

     

     

                                                     

    -   

      SUBTOTAL                                             -   
     Plumbing work         
    Provide and fix UPVC 1" UPVC tigger elbow   Nr 

     

     

     

                                                     

    -   

    Provide and fix 3/4" steel tap head England made or as specified by the engineer   Nr 

     

     

     

                                                     

    -   

     Provide and fix 3/4" UPVC tigger nipple   Nr 

     

     

     

                                                     

    -   

    Provide and fix 3/4" UPVC tigger socket   Nr 

     

     

     

                                                     

    -   

    Provide and fix  1" by 3/4" Bushing England made or as specified by the engineer   Nr 

     

     

     

                                                     

    -   

     Provide and fix 1" UPVC tigger pipe in the collection point and extend aleast 2m away from the collection point   Nr 

     

     

     

                                                     

    -   

     Provide and fix 1" UPVC stop cork regulator at the collection point     Nr 

     

     

     

                                                     

    -   

      SUBTOTAL                                             -   
    Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL                                         -   
     

    Total carried to summary - CONSTRUCTION OF WATER COLLECTION 

    POINT_WITH RAMP AND RAIL FOR 2 UNITS 

                                             -   
    BOQ: For Solar Installation 5.5 Watts System 
      Tiles 40/40  20mtr  20     
    Supply and Install 3M scotch cast Cable jointing kit & earthing  Set   

                                                     

    -   

             
    Supply & Install Support Structure and frame for panels as in TSS  NR   

                                                     

    -   

    Supply and Install 3X6mm2 pump motor cables  Set     

                                                     

    -   

    Supply and Install 4mm2 inter-connector cables  Set     

                                                     

    -   

    Supply and Install High pressure 2" PVC riser piping (8bar) for pump installation  45     

                                                     

    -   

    Supply and Install  level switch  Set     

                                                     

    -   

    Provide and fix 16mm Marine rope to secure the pump  Meter  45     

                                                     

    -   

    10  Provide or construct a chamber as protector at the well head to secure the pump from vandalIzation. This can be in form of concrete or steel as specified by the engineer  Lumpsum     

                                                     

    -   

    11  Provide and install 6 feet copper earthen rod  Piece    1.0   

                                                     

    -   

    12  Provide and install  copper lightening arrester  Piece    1.0 
    13  Provide and fix 16mm lex of 15m length (made in Nigeria)  Roll    1.0 
    14  Provide and fix scrotch cast connection for the borehole cable  Piece    1.0 
    15  Provide and fix adjustable strap for cable tightening  Pack    1.0 
    16  Provide and fix 16m cable lock  Piece    1.0 
      Sub Total         

                                                     

    -   

    Summary – Mobilization                                               -   
    Summary - Construction of water collection point with ramp and rail for 3 units                                               -   
    Summary - Solar Installation 1,150 Watts System                                               -   
    Summary - Anti-theft Mechanism on Wellbore                                               -   
    Total                                -   

     

    WATER POINT 4 

     

      BOQ FOR THE REHABILITATION OF KASULA SOLAR POWERED BOREHOLE IN MAFA LGA, BORNO STATE, NIGERIA. 
      DESCRIPTION OF WORKS  UNIT  QTY   COST   TOTAL COST 
    Mobilization and Demobilisation (Establishment of a base Station): Mobilization of all necessary materials, equipment, and all personnel to the base station for site clearance, borehole developments, pumping test and recovery tests, civil works, and installation of motorized pumps; including demobilisation of all Plants, Equipment's and all resources from sits upon completion of installation works.  Lumpsum     
    Allow for data analysis and writing reports (Borehole completion reports, pump test report, installation report) in two hard copies and 1 electronic copy.  Lumpsum                                                         -   
      Total carried to summary: MOBILIZATION         
      CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL 
    EARTH WORK         
    Site Clerance: Clear and and remove all tres, shrubs, and obstacle to be disposed 100m away from the site.    m2  24.5                                                         -   
    Excavate for the Foundation to receive concrete work not exceeding 700mm depth  m3  5.23                                                         -   
    Backfilling  to the sides of the excavated foundation footing using selected excavated materials to achieve maximum campaction ratio.  m3  1.87                                                         -   
    Remove surplus excavated material away from the site  m3  0.93                                                         -   
    Excavation of soak pitnot exceeding 1.5m from natural ground level as specified on the drawings  m3  17.85                                                         -   

     

    Provide hardcore material to the floor site of the water point  m2  9.4                                                         -   
      SUBTOTAL                                               -   
    CONCRETE WORK         
    Provide and place 50mm thick plain concrete to ratio 1:3:6 grade 10 for foundation trench as specified on the drawing and specification.  m3  0.85                                                         -   
    Plastering/Rendering of water point using ratio 1:3  m2  11.25                                                         -   
    Ditto: Apron  m3  5.66                                                         -   
     Provide mass cocrete to the ramp using ratio 1:3:6  m3               0.27                                                         -   
    Reinforced concrete cover slab to ratio 1:2:4 grade 15  m3  0.26                                                         -   
    Ditto: Apron  m2  0.5                                                         -   
      SUBTOTAL                                               -   
    REINFORCEMENT         
      1  High yield steel deformed bars to BS4449         
      2  Provide and fixed Y 12mm Ø reinforcement bar for soak pit slab  Kg  37                                                         -   
      3  Binding wire  Kg                                                         -   
      SUBTOTAL                                               -   
     D  FORMWORK         
      1   Provide 2"x4" hard wood timber to the sides of slab   pcs               4.80                                                         -   
      2   3" assorted nails   kg               1.00                                                         -   
      SUBTOTAL                                               -   
    MASONRY WORK         

     

     Provide and lay 230mm thick hollow blocks of 1:3 mix ratio  enbedded and jointed to cement sand mortar(1:4) to the perimeter and Apron of the water point including ramp and 3 metre drainage channel connecting collection point and soak pit  m2            17.92                                                         -   
     Sand cement plastering/rendering of 20mm thick, finished smooth: To internal & external fence walls.  m2            12.87                                                         -   
     Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the soak pit allowing maximum of 3 opening to sides od the pit for proper seapage  m2            14.20                                                         -   
     50mm thick concrete blinding to ratio 1:3:6 grade 10 for soak pit  m3               0.31                                                         -   
     Block fill the block using week concrete  m3               2.24                                                         -   
      SUBTOTAL                                               -   
    STEEL WORK         
    Provide and fixed 1 1/4" diameter pure black circular hand rail to the both sides of the ramp as shown on the drawing            29.20                                                         -   
      SUBTOTAL                                               -   
     Plumbing work         
    Provide and fix UPVC 1" UPVC tigger elbow   Nr                    2                                                         -   
    Provide and fix 3/4" steel tap head England made or as specified by the engineer   Nr                    6                                                         -   
     Provide and fix 3/4" UPVC tigger nipple   Nr                    6                                                         -   
    Provide and fix 3/4" UPVC tigger socket   Nr                    6                                                         -   
    Provide and fix  1" by 3/4" Bushing England made or as specified by the engineer   Nr                    6                                                         -   

     

     Provide and fix 1" UPVC tigger pipe in the collection point and extend aleast 2m away from the collection point   Nr                    2                                                         -   
     Provide and fix 1" UPVC stop cork regulator at the collection point     Nr                    1                                                         -   
      SUBTOTAL                                               -   
    Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL                                           -   
     

    Total carried to summary - CONSTRUCTION OF WATER COLLECTION 

    POINT_WITH RAMP AND RAIL FOR 2 UNITS 

                                               -   
    BOQ: For Solar Installation 5.5 Watts System 
      Tiles 40/40  20mtr  20     
    Supply and Install 3M scotch cast Cable jointing kit & earthing  Set                                                         -   
             
    Supply & Install Support Structure and frame for panels as in TSS  NR                                                         -   
    Supply and Install 3X6mm2 pump motor cables  Set                                                         -   
    Supply and Install 4mm2 inter-connector cables  Set                                                         -   
    Supply and Install High pressure 2" PVC riser piping (8bar) for pump installation  45                                                         -   
    Supply and Install  level switch  Set                                                         -   
    Provide and fix 16mm Marine rope to secure the pump  meter  45                                                         -   
    10 

    Provide or construct a chamber as protector at the well head to secure the pump from vandalIzation. This can be in form of 

    concrete or steel as specified by the engineer 

    Lumpsum                                                         -   
    11  Provide and install 6 feet copper earthen rod  Piece  1.0                                                         -   
    12  Provide and install  copper lightening arrester  Piece  1.0 
    13  Provide and fix 16mm lex of 15m length (made in Nigeria)  Roll  1.0 
    14  Provide and fix scrotch cast connection for the borehole cable  Piece  1.0 
    15  Provide and fix adjustable strap for cable tightening  pack  1.0 


     

                                                                                                                               

     

    16  Provide and fix 16m cable lock    Piece  1.0     
      Sub Total           
    Summary – Mobilization                                         -     
    Summary - Construction of water collection point with ramp and rail for 3 units                                         -     
    Summary - Solar Installation 1,150 Watts System                                         -     
    Summary - Anti-theft Mechanism on Wellbore                                         -     
    Total                         -     


     

     

    WATER POINT 5 

    BOQ FOR THE REHABILITATION OF HOSPITAL SOLAR POWERED BOREHOLE IN MAFA LGA, BORNO STATE, NIGERIA. 
      DESCRIPTION OF WORKS  UNIT  QUANTITY   COST   TOTAL COST 
    Mobilization and Demobilisation (Establishment of a base Station): Mobilization of all necessary materials, equipment, and all personnel to the base station for site clearance, borehole developments, pumping test and recovery tests, civil works, and installation of motorized pumps; including demobilisation of all Plants, Equipment's and all resources from sits upon completion of installation works.  Lumps um     
    Allow for data analysis and writing reports (Borehole completion reports, pump test report, installation report) in two hard copies and 1 electronic copy.  Lumps um   

                                           

    -   

      Total carried to summary: MOBILIZATION         
    CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL 
    EARTH WORK         
    Site Clerance: Clear and and remove all tres, shrubs, and obstacle to be disposed 100m away from the site.  m2  24.5   

                                         

    -   

    Excavate for the Foundation to receive concrete work not exceeding 700mm depth  m3  5.23   

                                           

    -   

    Backfilling   to the sides of the excavated foundation footing using selected excavated materials to achieve maximum campaction ratio.  m3  1.87   

                                           

    -   

    Remove surplus excavated material away from the site  m3  0.93   

                                           

    -   

    Excavation of soak pitnot exceeding 1.5m from natural ground level as specified on the drawings  m3  17.85   

                                           

    -   

    Provide hardcore material to the floor site of the water point  m2  9.4   

                                           

    -   

      SUBTOTAL       

                                           

    -   

    CONCRETE WORK         
    Provide and place 50mm thick plain concrete to ratio 1:3:6 grade 10 for foundation trench as specified on the drawing and specification.  m3  0.85   

                                           

    -   

    Plastering/Rendering of water point using ratio 1:3  m2  11.25   

                                           

    -   

    Ditto: Apron  m3  5.66   

                                           

    -   

     Provide mass cocrete to the ramp using ratio 1:3:6  m3 

     

    0.27 

     

     

                                           

    -   

     

    Reinforced concrete cover slab to ratio 1:2:4 grade 15  m3  0.26   

                                           

    -   

    Ditto: Apron  m2  0.5   

                                           

    -   

      SUBTOTAL       

                                           

    -   

    REINFORCEMENT         

         

    High yield steel deformed bars to BS4449         

         

    Provide and fixed Y 12mm Ø reinforcement bar for soak pit slab  Kg  37   

                                           

    -   

         

    Binding wire  Kg   

                                           

    -   

      SUBTOTAL       

                                           

    -   

     D  FORMWORK         

         

     Provide 2"x4" hard wood timber to the sides of slab   pcs 

     

    4.80 

     

     

                                           

    -   

         

     3" assorted nails   kg 

     

    1.00 

     

     

                                           

    -   

      SUBTOTAL       

                                           

    -   

    MASONRY WORK         
     Provide and lay 230mm thick hollow blocks of 1:3 mix ratio  enbedded and jointed to cement sand mortar(1:4) to the perimeter and Apron of the water point ncluding ramp and 3 metre drainage channel connecting collection point and soak pit  m2 

     

    17.92 

     

     

                                           

    -   

     Sand cement plastering/rendering of 20mm thick, finished smooth: To internal & external fence walls.  m2 

     

    12.87 

     

     

                                           

    -   

     Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the soak pit allowing maximum of 3 opening to sides od the pit for proper seapage  m2 

     

    14.20 

     

     

                                           

    -   

     50mm thick concrete blinding to ratio 1:3:6 grade 10 for soak pit  m3 

     

    0.31 

     

     

                                           

    -   

     Block fill the block using week concrete  m3 

     

    2.24 

     

     

                                           

    -   

     

      SUBTOTAL       

                                           

    -   

    STEEL WORK         
    Provide and fixed 1 1/4" diameter pure black circular hand rail to the both sides of the ramp as shown on the drawing 

     

    29.20 

     

     

                                           

    -   

      SUBTOTAL       

                                           

    -   

     Plumbing work         
    Provide and fix UPVC 1" UPVC tigger elbow   Nr 

     

     

     

                                           

    -   

    Provide and fix 3/4" steel tap head England made or as specified by the engineer   Nr 

     

     

     

                                           

    -   

     Provide and fix 3/4" UPVC tigger nipple   Nr 

     

     

     

                                           

    -   

    Provide and fix 3/4" UPVC tigger socket   Nr 

     

     

     

                                           

    -   

    Provide and fix  1" by 3/4" Bushing England made or as specified by the engineer   Nr 

     

     

     

                                           

    -   

     Provide and fix 1" UPVC tigger pipe in the collection point and extend aleast 2m away from the collection point   Nr 

     

     

     

                                           

    -   

     Provide and fix 1" UPVC stop cork regulator at the collection point     Nr 

     

     

     

                                           

    -   

      SUBTOTAL       

                                           

    -   

    Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL   

                                           

    -   

     

    Total carried to summary - CONSTRUCTION OF WATER COLLECTION 

    POINT_WITH RAMP AND RAIL FOR 2 UNITS 

       

                                           

    -   

    BOQ: For Solar Installation 5.5 Watts System 
      Tiles 40/40  20mtr  20     
    Supply and Install 3M scotch cast Cable jointing kit & earthing  Set   

                                           

    -   

             
    Supply & Install Support Structure and frame for panels as in TSS  NR   

                                         

    -   

    Supply and Install 3X6mm2 pump motor cables  Set   

                                           

    -   

    Supply and Install 4mm2 inter-connector cables  Set   

                                           

    -   

                                                                                                                              

     

    Supply and Install High pressure 2" PVC riser piping (8bar) for pump installation  45     

                                           

    -   

    Supply and Install  level switch  Set     

                                           

    -   

    Provide and fix 16mm Marine rope to secure the pump  Meter  45     

                                           

    -   

    10  Provide or construct a chamber as protector at the well head to secure the pump from vandalIzation. This can be in form of concrete or steel as specified by the engineer  Lumps um     

                                           

    -   

    11  Provide and install 6 feet copper earthen rod  Piece    1.0   

                                           

    -   

    12  Provide and install  copper lightening arrester  Piece    1.0 
    13  Provide and fix 16mm lex of 15m length (made in Nigeria)  Roll    1.0 
    14  Provide and fix scrotch cast connection for the borehole cable  Piece    1.0 
    15  Provide and fix adjustable strap for cable tightening  Pack    1.0 
    16  Provide and fix 16m cable lock  Piece    1.0 
      Sub Total         

                                           

    -   

    Summary – Mobilization         

                                           

    -   

    Summary - Construction of water collection point with ramp and rail for 3 units         

                                           

    -   

    Summary - Solar Installation 1,150 Watts System         

                                           

    -   

    Summary - Anti-theft Mechanism on Wellbore         

                                           

    -   

    Total         

                             

    -   

    To be considered, bidders should submit a complete quotation not later than the closing date and time indicated above. Bidders should ensure that the quotation is well written in English, easy to read, follows the instructions provided, and contains only requested information. 

    QUESTION: Any questions should be submitted in writing and emailed to procurements@eynprojects.org no later than two days after the issue date of this RFQ. No questions will be entertained if they are received by means other than the specified email address, and any communications to alternate e-mail addresses will result in the disqualification of the bidder.  The solicitation number (listed above) should be stated in the subject line. Answers will be compiled and distributed within 1 day from the closing date of questions 

    The Bidder is required to include details of three business references; this should include the name, company, and relationship to the bidder, email address, and / or phone number for each reference. 

    EYN Projects reserves the right to visit the place of business of a prospective supplier to verify that it is a legal business entity and has the necessary organizational and management competence to fulfill the necessary responsibilities. 

    • All Bidders must provide proof of registration and tax. Attach CAC certificate and TIN when sending quotation. 
    • All transportation and handling charges if any should be incorporated into vendor’s quoted unit price. 

    DISCLAIMER: - Brand Names:  Specific brands and / or models indicated—while often preferred—are for description only.  An equivalent substitute, as determined by the specifications, will be acceptable. 

    The EYN projects estimates that the Service will be delivered over a period of 12days. The selected bidder(s) should have the capacity to provide the commodities needed by EYN projects within the aforementioned timeframe. The consumption range provided is an estimate, and EYN projects reserves the right to consume above or below this range, or to order partial Items, and the selected bidder(s) shall deliver accordingly. The selected bidder(s) must deliver the Service according to the provided timeline. 

    TENDER REQUIREMENTS:  - 

    To ensure that best value is obtained the following would be considered; 

    1. Evidence of Vendor’s registration with CAC and Tax Identification number 
    2. Acceptable quotation validity period 
    3. Availability of items                                                                                                            
    4. Delivery within specified time 
    5. Acceptable approved sample 

    EVALUATION CRITERIA: BEST VALUE: - Only quotations that meet the requirement above would be selected for evaluation. Please note that if there are significant deficiencies regarding responsiveness to the requirements of this RFQ, an offer may be deemed “non-responsive” and thereby disqualified from consideration. EYN Projects reserves the right to waive immaterial deficiencies at its discretion  

    Check how your CV aligns with this job

    Method of Application

    Quotations must be submitted in a sealed brown envelope to the designated bid box at the EYN Projects  Office at Old GRA, No 1 Madura street, Old Doctors Quarters, Maiduguri Borno State, Nigeria. Or via email to: tender@eynprojects.org with the subject line:  “EYNPN/CAID/MAFA/WASH/SEPT/2024/809 “SUPPLY OF 5 Borehole rehabilitation Service 

     

    Build your CV for free. Download in different templates.

  • Apply Now
  • Send your application

    View All Vacancies at Ekklesiyar Yan'uwa a Nigeria (... Back To Home

Subscribe to Job Alert

 

Join our happy subscribers

 
 
Send your application through

GmailGmail YahoomailYahoomail