Hobark International Limited is the parent company of the Hobark group operating in the oil and gas industry. The company was incorporated in 1998, starting as a staffing agency based in Port Harcourt. Currently we have offices in 4 countries with our head office in Lagos. The group offers the following services.
Drilling services are offered through Dril...
Read more about this company
The role provides the linkage and understanding of reservoir management, production optimization and initiatives within the subsurface and the surface production disciplines to understand the happenings down-hole and its relation to surface Well behavior.
Lead the reservoir management and Production Data Management for the Petroleum Engineering Department and Champion Hydrocarbon Accounting Implementation / Reconciliations
Deliver reservoir simulation, forecasting, dynamic modelling and overall reservoir management within the company’s assets by working with the geomodeller and production geologist
Deliver well & completions designs for all wells, Production optimization and multi‐discipline projects in accordance with World Class Hydrocarbon Maturation and Well Delivery and Intervention projects in accordance with World Class Hydrocarbon Maturation and Well Delivery and Intervention Processes, and the deliverables set by client requirements to optimize Oil & Gas recovery.
Significantly contribute to/ lead the delivery of quality reservoir development studies, field development plan (FDP), the Identification of production improvement opportunities and production optimization studies in conjunction with reservoir engineers, Petro-physicists and production geologists.
Well surveillance - Well Performance monitoring, Monitoring and follow-up/resolution of Production deferment issues, Bean-up candidates identification/ follow-up for execution.
Well Performance Review: Identification of wells for Coil Tubing re-entry and Rig re-entry for repairs.
Requirements
Bachelor's degree in Engineering, Petroleum Engineering / Related Technical Disciplines
Minimum of 15-years' core experience in Production Technology / Engineering
Strong working knowledge of IPM-GAP, Prosper, OFM and SAPHIR
Skill sets in Well surveillance, Nodal Analyses, Inflow and outflow performances
Conceptual Completion Design, understanding of a completions design and their services interfaces
Coil Tubing/ Slickline Operations and E-line Operations