GENERAL SPCIFICATIONS
The contractor shall be responsible for any damage to the nearby buildings or outsider or employee of the contractor during the course of construction.
The contractor sha
GENERAL SPCIFICATIONS
The contractor shall be responsible for any damage to the nearby buildings or outsider or employee of the contractor during the course of construction.
The contractor sha
GENERAL SPCIFICATIONS
The contractor shall be responsible for any damage to the nearby buildings or outsider or employee of the contractor during the course of construction.
The contractor sha
GENERAL SPCIFICATIONS
The contractor shall be responsible for any damage to the nearby buildings or outsider or employee of the contractor during the course of construction.
The contractor sha
GENERAL SPCIFICATIONS
The contractor shall be responsible for any damage to the nearby buildings or outsider or employee of the contractor during the course of construction.
The contractor sha
GENERAL SPCIFICATIONS
The contractor shall be responsible for any damage to the nearby buildings or outsider or employee of the contractor during the course of construction.
The contractor sha
GENERAL SPCIFICATIONS
The contractor shall be responsible for any damage to the nearby buildings or outsider or employee of the contractor during the course of construction.
The contractor sha
GENERAL SPCIFICATIONS
The contractor shall be responsible for any damage to the nearby buildings or outsider or employee of the contractor during the course of construction.
The contractor sha
GENERAL SPCIFICATIONS
The contractor shall be responsible for any damage to the nearby buildings or outsider or employee of the contractor during the course of construction.
The contractor sha
B: TASKS TO BE ACCOMPLISHED (SCOPE OF WORK);
Provide 225mm thick walling for external and internal wall with sandcrete hollow blocks: bedded and jointed in cement and sand (1:4) mortar from foun
PROJECT OVERVIEW
Finpact Consulting is issuing a Request for Proposals (RFP) for vendor services to supply and install an inverter unit that will provide power for its services in the absence of the
International Alert Nigeria Programme is requiring to procuring used vehicle and seeking for a credible vendor to produce visibility materials. Please see the specifications below.
1. &nbs
Ground Type: Concrete Flooring (Recommendations Highly Welcomed)Court Size: 28m (length) by 15m (width)3 Point Line Distance: 6.5m (length) by 16.5 (width)Penalty Spot to Goal Line: 8mCentre-Circle Di
Bauchi Opportunities for Maternal and Neonatal Health (BORN)
1.0 Overview of request for proposal
The Consultant will serve as the lead coordinator for the Final Evaluation of the Bauchi
Quotations must be packaged in sealed envelopes, addressed and submitted to the Procurement Unit of CS-SUNN at Plot 203 Cadestral Zone B02, Off Oladipo Diya way (Beside Concordia Apartments), Durumi,