Jobs Career Advice Post Job
X

Send this job to a friend

X

Did you notice an error or suspect this job is scam? Tell us.

Oops! It seems this job from Sterling Oil Exploration & Energy Production Company Limited (SEEPCO) has expired
View current and similar jobs using the button below
  • Posted: Apr 12, 2023
    Deadline: Apr 30, 2023
    • @gmail.com
    • @yahoo.com
    • @outlook.com
  • Sterling Energy and Exploration Production Limited (SEEPCO) , Diversification in Petroleum Exploration and Production. The SEEPCO has businesses in 6 continents and several countries viz. India, USA, China, Japan, Europe, Middle East, South East Asia etc, The SEEPCO has ventured into the Petroleum Exploration and Production in 2006 by establishing Ster...
    Read more about this company

     

    Senior Electrical Engineer - Gas Based Combined Cycle Power Project, 330KV GIS Substation

    Job Description

    • The Senior Electrical Engineer is responsible for the technical content associate in design engineering, BOQ, Planning, Testing and Commissioning of Gas Turbine Generator, Steam Turbine Generator,330KV substation and its auxiliaries including CW system, HRSG along with its associated Electrical PEECC, GCB, GSUT, UAT, Aux Transformers, DC system, UPS system, MV/LV cables, Motors, Grid Earthing.

    Main Duties

    • Expertise in Design Engineering, Sizing Calculation, BOQ, planning and overseeing installation,Testing and Commissioning of Gas Turbine capacity of 200MW, 330KV GIS substation, MV/LV SWGR, GSUT, UAT, STG and its auxiliaries along with associated Electrical equipment’s. Planning, BOQ & time management. Hands-on experience of project execution & erection/ Commissioning.
    • In depth knowledge in design & Sizing of GTG, STG, GSUT, IPBD, GCB, UAT, MV/LV switchgear, NSPBD, Cable trays, Duct banks, CW system, HRSG, Motors, Fuel gas skids and rotating equipment, Earthing.
    • Preparation of Sizing Calculation for GSUT, UAT Aux transformer, Site Construction Power - Sizing Calculation
    • Preparation of Electrical Load List, 220V DC system sizing calculation, MV power Cables Sizing Calculation, LV power Cables Sizing Calculation
    • Preparation of MV Switchgear sizing calculation, LV Switchgear sizing calculation, 230 V UPS system sizing calculation, Black Start /Emergency Gas Generator sizing calculation.
    • Knowledge in Earthing System Design Calculation, Lightning protection system design calculation, calculation of Short circuit study.
    • Preparation of BOQ for Electrical equipment’s for powerplant like cables, Distribution Boards, Lighting Boards, PCC / MCC / PMCC / PDB / small power, lighting panels MLDB / LDB / SLDB, ACBD, DCDB, switches, JBs, MCCB / MCB, RCCB, receptacle etc Specification.
    • Knowledge in Electrical software for Electrical study ETAP, DIALUX for lighting, AutoCAD, SCADA.
    • Shall be capable of designing and preparing BOQ for site Earthing system, Lighting system, Overall Cable Routing Layout preparing Cable schedule for Electrical systems.
    • Review of Electrical control philosophy, SLD, equipment list, cable schedule, Control diagram, Protection panels diagram released for construction.
    • Familiar with Electrical Protection system and interlocks between LVMCC, MV SWGR, GPP & Substation.
    • Preparation of Technical evaluation of all electrical systems for combined cycle power plant.
    • Knowledge in cable schedule between equipment’s of GTG, STG, HRSG,330KV GIS substation.
    • Preparation of Purchase request and technical validation of Electrical Items for Combined cycle power plant.
    • Design plant lighting, grounding, and lightning protection and preparation of BOM.
    • Design interconnect cabling and layout cable trays including BOM development.
    • Preparation of HRSG area cable routing, Overall- Outdoor Area Lighting & small Power Layout & SLD
    • Deep domain expertise on Plant level protection scheme design, setting calculation and relay coordination studies.
    • Ability to develop plant level electrical design documentation such as high level and detail plant HV, MV single lines & three-line w/protection, instrumentation & metering details, interlocking scheme as well as LV & DC distribution system for a complete power plant and HV substation.
    • Hands on experience and knowledge of Industry recognized electrical codes & Standards as well as working knowledge of Electrical installation practices.

    Requirements

    • Bachelor’s Degree in Electrical Engineering.
    • 10+ years experience in the power plant projects with specific experience in Engineering of Gas Turbine,330KV GIS substation, Transformer, MV/LV SWGR and its auxiliaries.
    • Ability to work efficiently and effectively when managing multiple tasks.
    • Effective oral and written communications and excellent interpersonal skills with the ability to deal effectively with other discipline Lead(s) and Engineer.
    • Must be self-motivated, results oriented, and be flexible to work well under tight schedules in a fast-paced multi-disciplinary team environment.

    Check how your CV aligns with this job

    Method of Application

    Interested and qualified candidates should send their CV to: oilgasandconstructionjobs@gmail.com using "Senior Electrical Engineer" as the subject of the mail.

    Build your CV for free. Download in different templates.

  • Apply Now
  • Send your application

    View All Vacancies at Sterling Oil Exploration &... Back To Home

Subscribe to Job Alert

 

Join our happy subscribers

 
 
 
Send your application through

GmailGmail YahoomailYahoomail