Jobs Career Advice Post Job
X

Send this job to a friend

X

Did you notice an error or suspect this job is scam? Tell us.

Oops! It seems this job from Ekklesiyar Yan'uwa a Nigeria (EYN PROJECT) has expired
View current and similar jobs using the button below
  • Posted: Feb 18, 2025
    Deadline: Mar 3, 2025
    • @gmail.com
    • @yahoo.com
    • @outlook.com
  • EYN Projects respects and believes in the infinite worth of every individual. We demonstrate this belief through our development and humanitarian services to affected communities, equal employment opportunities, building and strengthening staff's skills, and ensuring qualitative and effective service delivery. EYN Projects does not discriminate based on gender, ethnicity, or religion in our recruitment exercise nor in our humanitarian and development work.
    Read more about this company

     

    Request for Quotes for the Rehabilitation Services

    RFQ N0:  EYNPN/IOM/MMC/BOR/FEB/2025/0090 “REHABILITATION OF SOCIAL AND PRODUCTIVE INFRASTRUCTURES BASED ON COMMUNITY PREFERENCE IN SELECTED LOCATIONS (SOCIAL IMPACT PROJECT) ”

    CLOSING DATE: 3rd March 2025, 5:00 PM

    LOCATION: MMC

                                              ITEM / DISCRIPTION               UNIT     QUANTITY
    1. Rehabilitation Of 3 Bedroom Fully Detached Flat with Waiting Area and Hall At Gidan Yara, Gidan Madara
    Lumpsum 1
    1. Rehabilitation Of 3 Bedroom Semi Detached Flat with Waiting Area
    Lumpsum 1
    1. Rehabilitation of 1 Block of 3 Classrooms and Painting of 1 Block Of 2 Classrooms at Gidan Yara, Gidan Madara
    Lumpsum 1
    1. Rehabilitation 0f 1 Block of 2 Rooms Kitchen at Gidan Yara, Gidan Madara
    Lumpsum 1
    1. Rehabilitation of 2 Block of Toilets at Gidan Yara, Gidan Madara
    Lumpsum 1
    1. Rehabilitation of Water Point at Gidan Yara, Gidan Madara
    Lumpsum 1
    1. Rehabilitation of one Bedroom Apartment at Gidan Yara, Gidan Madara
    Lumpsum 1
           

    To be considered, bidders should submit a completed request for quotation form and quotation on company’s letterhead not later than the closing date and time indicated above. Bidders     should ensure that the quotation is well written in English, easy to read, follows the instructions provided, and contains only requested information.

    QUESTION: Any questions should be submitted in writing and emailed to procurements@eynprojects.org no later than three days after the issue date of this RFQ. No questions will be entertained if they are received by means other than the specified email address, and any communications to alternate e-mail addresses will result in the disqualification of the bidder.  The solicitation number (listed above) should be stated in the subject line. Answers will be compiled and distributed within 1 day from the closing date of questions

    The Bidder is required to include details of three business references; this should include the name, company, and relationship to the bidder, email address, and / or phone number for each reference.

    EYN Projects reserves the right to visit the place of business of a prospective supplier to verify that it is a legal business entity and has the necessary organizational and management competence to fulfill the necessary responsibilities.

    • All Bidders must provide proof of registration and tax. Attach CAC certificate and TIN when sending quotation.
    • All transportation and handling charges if any should be incorporated into vendor’s quoted unit price.

    DISCLAIMER: - Brand Names: Specific brands and / or models indicated—while often preferred—are for description only.  An equivalent substitute, as determined by the specifications, will be acceptable.

    The EYN projects estimate that the rehabilitation will be delivered within a period of 714 days. The selected bidder(s) should have the capacity to provide the services needed by EYN projects within the aforementioned timeframe. The consumption range provided is an estimate, and EYN projects reserves the right to consume above or below this range, or to order partial Items, and the selected bidder(s) shall deliver accordingly. The selected bidder(s) must deliver the services according to the provided timeline.

    TENDER REQUIREMENTS:  - 

    To ensure that best value is obtained the following would be considered;

    1. Evidence of Vendor’s registration with CAC, Tax Clearance Certificate and Identification Card (preferably NIN, International Passport or Voter’s card) of Company’ lead and Representation
    2. Acceptable quotation validity period
    3. Availability of items
    4. Delivery within specified time
    5. Not less than 3 years’ experience in similar services with Proof
    6. The quotation is applicable to 3% withholding tax and 1% Stamp duty.

    EVALUATION CRITERIA: BEST VALUE: - Only quotations that meet the requirements above would be selected for evaluation. Please note that if there are significant deficiencies regarding responsiveness to the requirements of this RFQ, an offer may be deemed “non-responsive” and thereby disqualified from consideration. EYN Projects reserves the right to waive immaterial deficiencies at its discretion

     

    BOQ                                                                                REHABILITATION OF ONE BEDROOM APARTMENT AT GIDAN YARA, GIDAN MADARA

               
    I Sub Structure     Unit Price Total Amount
      Site Clearing m2 15.00    
      Excavation of strip foundation of 1m width, to a suitable depth not exceeding 1m. m 12.00    
      Excavate column base m3 69.00    
      Treatment of foundation with anti termite Dieldrex m2 20.00    
      Blinding for Strip Foundation 50mm bed m3 0.60    
      Blinding for Column bases m3 0.70    
      Column Base Reinforcements, Y12 kg 250.00    
      Striprups Kg 158.00    
      Instu Plain Concrete        
      Foundation Strip/Footing m3 1.00    
      Blockwork        
      Walls 230 Thick m2 15.00    
      Reinforced; Instu Vibrated Concrete Grade 25 - 1:2:4        
      Column Bases m3 1.00    
      Columns m3 1.00    
      Bed not exceeding 150mm thick m3 2.50    
      Formwork        
      Edge of Columns, beams and slab bed m2 2.00    
      Laterite filling        
      Backfilling m3 15.00    
      Hardcore        
      150mm thick m3 15.00    
      Summary Substructure        
               
    II Super Structure        
      Blockwork        
      Walls 230 Thick m2 50.00    
      Reinforced; Instu Vibrated Concrete Grade 25 - 1:2:4        
      Column m3 1.00    
      Lintels m3 1.00    
      Roof Beam m3 1.00    
      Reinforcement for Columns, Lintel and roof beams Kg 300.00    
      Formwork        

     

      Sides of Columns, beams and Lintel m2 1.00    
      Windows        
      Size 1200x1200mm Nr 4.00    
      Door        
      Size 1200x2100mm Nr 1.00    

    III                    Roofing

    2x6                                                                            m           50.00

    2x4                                                                            m           90.00

    2x3                                                                            m           150.00

    2x2                                                                            m           180.00

    Roof covering pitch 10 degrees, 0.20CGI Zinc       m²          108.00

    Finishes

    Renderwalls                                                             m2        120.00

    TILES

    400 x 400 x 8mm Royal tiles or equal and approved bedded and jointed in cement and sand mortar (1:3) on screeded bed (measured separately) and pointed

    in white   cement .

    8mm Tiles Paving                                                     m2         46.00

    100mm Skirting                                                        m           45.00

    PAINTING AND DECORATING  
     FinecoatProducts orEqual

     

    Prepareand apply twocoats of emulsion paints on

    Wall m2         136.00

     

     

    IV

     

      Ceiling m2 65.00    
    V Electricals:        
      Allow provisional sum of Lsum 1    
               
    VI Builder's works          
     
      Allowfor builder's works in connection with all works in this section sum 1    
       
      Summary Superstructure  
       
    GRAND TOTAL  

     

    BOQ

    REHABILITATION OF 1 BLOCK OF 2 ROOMS KITCHEN AT GIDAN YARA, GIDAN MADARA

               
            UNIT PRICE TOTAL PRICE
    I FLOOR FINISHES        
      Cement and Sand (1:3) Beds &backing        
      42mm screeded bedding to Floor m2 45.00    
      12mm backing to smooth finish m2 45.00    
               
    II DOORSAND WINDOWS        
      Supply and fix purpose made steel doors with complete with locks and frames        
      Size 900 X 2100mm high Nr 2.00    
      WINDOWS        
      Supply and fix seethrough or fancy blocks          
      Size 100 x 200mm Nr 40.00    
               
    III COOKING AREA        
      Allow Provisional sum for fixing of cooking area LS 1.00    
               
    IV ROOFCOVERING        
      Replace roofing sheets Bundle 1.00    
               
    V PAINTING AND DECORATING        
      Finecoat Products or Equal        
      Prepare and apply two coatsof emulsion paints on        
      Wall (External ) m2 80.00    
      Wall (Internal Halfway) m2 80.00    
      Oil Paint        
               
      Prepare and apply two coatsof oil paints on        
      Wall (Halfway) m2 80.00    
               
               
    VI ELECTRICAL        
      Allow a provisional sum for electrical fittings LS 1.00    
             
    VII Builder's works        
      Allowfor builder's works in connection with all works in this section

     

    sum

     

    1

       
    GRAND TOTAL

     

    PRICING DOCUMENT

    REHABILITATION OF 1 BLOCK OF 3 CLASSROOMS  ANDPAINTING OF 1 BLOCK OF 2

    CLASSROOMS  AT GIDAN YARA, GIDAN MADARA

     
     
            UNIT PRICE TOTAL AMOUNT  
    I

    FLOOR FINISHES

    Cement and Sand (1:3) Beds & backing

           
             
      42mm screeded bedding to Floor m2 m2

    30.00

     

     

    45.00

         
      12mm backing to smoothfinish      
                 
    II WINDOWS WINDOWS          
             
      Supply and fix glass on window Frame          
      Size 600 x 1200mm Nr 2.00      
             
    III

    ROOFCOVERING

    Supply and Fix Ceiling

             
    m2 60.00      
             
    IV

    STEPS AND RAMP

    Repair and fix steps and ramp

             
             
      Steps          
      size 300 x 1000mm LS 1.00      
      Ramp      
      Size 600 x 1000mm LS 1.00      
             
    VI PAINTING AND DECORATING Finecoat Products or Equal          
             
      Prepare and apply two coatsof emulsion paints on          
      Wall m2 850.00    
               
    V ELECTRICAL        
      Allow a provisional sum for electrical fittings LS 1.00    
             
    VI Builder's works        
      Allow for builder's works in connection with all works in this section

     

    sum

     

    1

       
    GRAND TOTAL

     

    BOQ

    REHABILITATION OF 2 BLOCK OF TOILETS AT GIDAN YARA,GIDAN MADARA

    I FLOOR FINISHES        
      Cement and Sand (1:3) Beds & backing        
      42mm screeded bedding to Floor m2 60.00    
      300x300mmTiles m2 40.00    
      Wall m2 20.00    
               
    II WINDOWS AND DOORS        
      Windows        
      Supply and install purpose madesteel window           
      Size 600 x 600mm Nr 4.00    
      Doors        
      Supply and install purpose madesteel doors           
      Size 900 x 2100mm Nr 4.00    
    IV STEPS AND RAMP        
      Repair and fix steps and ramp        
      Steps        
      size300 x 1000mm LS 1.00    
      Ramp        
      Size 600 x 1000mm LS 1.00    
               
    VI PAINTING AND DECORATING        
      Finecoat Productsor Equal        
      Prepare and apply two coats of emulsion paints on        
      Wall m2 180.00    
      Ceiling m2 30.00    
               
      PLUMBING AND SANITARY FITTINGS        
      Allow for water connection to Toilet

    Ls

     

    Nr

    1.00    
      Supply and installsquat water closet, washhand basinand all accessories

     

    4.00

       
             
    V ELECTRICAL        
      Allow a provisional sum for electricalfittings LS 1.00    
             
    VI Builder's works        
      Allow for builder's works in connection with all works in this section

     

    sum

     

    1

       
    GRAND TOTAL

    BOQ

    REHABILITATION OF3 BEDROOM FULLY DETACHED FLAT WITH WAITNG AREA AND HALLAT GIDAN YARA, GIDAN MADARA

     

    I                      FLOOR FINISHES AND WALL TILES

    Carefully Chiesel through surface of existing concrete floor to fix new tiles

    m2         9.00

    400 x 400 x 8mm Royal tiles or equal and approved   bedde d and  jointed in cement and sand mortar (1:3) on screeded bed (measured separately) and pointed in white   cement . 

    8mm Tiles Paving                                                      m2         158.00

    100mm Skirting                                                        m           231.00

    Cement and Sand (1:3) Beds & backing

    42mm screeded bedding to Quarry tiles                   m2         158.00

    12mm backing toskirting                                         m           231.00

    Wall Tiles at Toilet                                                   m2         40.00

    II                     DOORS AND WINDOWS

    Supply and fix wooden panel flush door for rooms and Turkish Door for entrance with complete  with  locks and frames 

    Size 900 X 2100mm high                                          Nr         6.00

    Size 1200 x 2100 in two openings leaves                 Nr          1.00

      Fix exit door to Kitchen handles Nr 1.00    
      WINDOWS          
     
      Supply and fix purpose made steel mosquitoes Nets        
     
      Size 1200 x 1200mm Nr 16.00    
      Size 1800 x 600mm Nr 3.00    
      Fix lovures glasses (200x800mm) Nr 15.00    
               
    III WARDROPES          
     
      Supply and Fix MDF wood or equivalent          
    wardropes  
     
      Size 1800 x 2100mm Nr 1.00    
      Size 1400 x 2100mm Nr 1.00    
               
    IV WASTE DISPOSAL          
     
      Carefully break existing inspection chamber and dispose LS 1.00    
     

     

     

    Construct 1 x 1 x2m chamber (using 6" blocks

    and block fill with lightconcrete - 1:6) plastered in and out. Also, install fabricated cover of 3mm

    thick guage properly treated with anti-rust paint and install a big high quality steel pad locks. (sanitary seal)

     

     

     

     

    LS

     

     

     

     

    1.00

       
               
    V ROOF COVERING          
     
      Check for possible leaking and fix LS 1.00    
      Replace ceiling board m2 50.00    
                         
               
    VI PAINTINGAND DECORATING          
     
      Finecoat Products or Equal          
     
      Prepare and apply two coats of emulsion paints        
    on  
     
      Wall m2 520.00    
      Ceiling m2 350.00    
               
      PLUMBING AND SANITARY FITTINGS        
      Supply and install water closet with wash hand basin at Director's office Nr 1.00    
      Supply and install squat water closet, wash hand basin and all accessories Nr 2.00    
               
    VII ELECTRICAL          
     
      Allow a provisional sum for electrical fittings LS 1.00    
             
      PVC CEILING        
      Supply and Fix PVc Ceiling at Entrance m2 180.00    
               
      OFFICEFURNITURE        
     

    Supply Standard Office Chair and Table for

    Director's office

    Ls

     

    Ls Ls

    Nr

    1.00    
      Supply and Install 42'' Television 1.00    
      Supply and Install a decoder Free to Air 1.00    
      Supply and Install a 3 seater stainless steel chairs 3.00    
                       

     

               
    VIII Builder's works          
     
      Allow for builder's works in connection with all works in this section sum 1    
    GRAND TOTAL

     

     

    BOQ

    REHABILITATION OF 3 BEDROOM SEMI DETACHED FLAT WITH WAITNG AREA

     
     
                 
    I

    DOORS AND WINDOWS

    Supply and fix wooden panel flushdoor for rooms and Turkish Door for entrance with complete with locks and frames

             
             
      Size 900 X 2100mm high

    Nr

     

    Nr

    5.00

     

    1.00

         
      Size 1200 x 2100 in two openings leaves      
      WINDOWS          
      Supply and fix purpose made steel mosquitoes Nets          
      Size 1200 x 1200mm

    Nr

     

    Nr

    16.00

     

    3.00

         
      Size 1800 x 600mm      
                 
    II INFANT BEDS          
             
     

    Fix broken beds

     

    Paint All infant beds using an approved oil paint

    Nr

     

    Nr

    5.00

     

    10.00

         
           
                 
    III

    KITCHEN CABINETS

    Size 600 x 1200 x 5000mm

             

    Nr

     

    Nr

    1.00

     

    1.00

         
      Size600 x 1200 x 2000mm      

     

    IV PAINTING AND DECORATING        
      Finecoat Products or Equal        
      Prepare and apply two coatsof emulsion paints on        
      Wall m2 820.00    
               
      Ceiling m2 450.00    
               
    V OFFICEFURNITURE        
      Supply Standard Office Chair and Table for 2 offices Ls 1.00    
               
               
    VI ELECTRICAL        
      Allow a provisional sum for electrical fittings LS 1.00    
             
    VII Builder's works        
      Allowfor builder's works in connection with all works in this section

     

    sum

     

    1

       
    GRAND TOTAL

     

    PRICING DOCUMENT

    REHABILITATION OF WATERPOINT AT GIDAN YARA,GIDAN MADARA

               
    I PLUMBIMG WORKS     UNIT PRICE TOTAL AMOUNT
               
     

    Supply  and install  15 length  of 1 1/4" PVC pipe  (tiger  made),

    10  pcs  of  PVC  elbow,  3  pcs  of  PVC  Tee,  4  pcs  of  PVC  gate valve  for washouts  and outlets  to the storage  reserviour.  This include cost of materials and labourfor installations.

     

     

    LS

     

     

    1.00

       
      Construct a water collection point 2.5 X 3.0 X 1m, (LxBxH) plastered  completely  and install  2nos  1 1/4 "GI outlet  and a purpose  made  hanger  for  the  flexible  horse  tobe  hung.  Also supply  and install a 5m length  1 1/2"flexible  horse.  Note: the concrete platform for the water collection point should be compacted in layers of 0.15m laterite soil, boulders with 6" concrete  thickness  (1:3:6,  aggregate  (2"  granite)),  sloping  at least  0.1m.  lay  one  course  of  9"  blocks  at  the  two  sides  and install two (2) purpose  made hangers  and plaster accordingly. The mansory stand for water outlets is 1m height.

     

     

     

     

     

     

    LS

     

     

     

     

     

     

    1.00

       
      Supply all required materials and construct a 4meter length drainage  using   6" hollow  blocks  to be laid in parrallel  6 inch apart,  every  line should  have   2 courses  of blocks  jointed  with cement  sand  mortar  (1:6)  embeded  on 50mm  blinding  as its foundation.      Internal     and    external    plastering      should    be applied    with   proper   dressing.This  is  to   connect    collection point to an existing drainage.

     

     

     

     

    LS

     

     

     

     

    1.00

       
      Construct   1 x 1 x 1m chamber   (using  6" blocks  andblock  fill with light concrete - 1:6) plastered in and out. Also, install  fabricated    cover  of  3mm  thick  guage  properly    treated  with anti-rust  paint  and    install  a big high  quality  steel  pad   locks. (sanitary seal)

     

     

    LS

     

     

    1.00

       
     

     

    Excavate    an  area  2x2m  not  exceeding    0.9m,  blind  properly  with  6" mass  concrete  (1:3:6).  Construct  a concrete  Platform

    2.3  x 2.3  x 3 m  (LXBXH).  Using  9"  concrete  blocks  embeded with    colums   and   basket   (0.6x0.6m    ,Bottom)    @  2.3    meter centers  with  ground  and  top  beams  respectively. Filled  with lateritic  earth  materials   compacted   in  layers  of  0.3m  fillled with   boulders    and   layed   with    150    mm   (6")   of   concrete thickness with steel bars 10mm diameter every 30cm with a concrete  cover  at the  top and buttom.  Also  plaster  the   entire  structure.  Install  4nos of a purpose  made hooks   using  12mm rod  as  support  for  ancoring  the  tank.  Note concrete  should

    contain 3" granite as gravel .

     

     

     

     

     

     

     

    Ls

     

     

     

     

     

     

     

    1.00

       
     

    Supply  and installation  of 5000  liters  PVC GEEPEE    tank  with

    complete     assessories     for   the    connections.  Note:   the   tank should  be  anchored  to  the  hooks  using  8   mm  rod  to   avoid wind effect

     

     

    Ls

     

     

    1.00

       
               
               
    GRAND TOTAL

     

             

     

     

    RFQ # EYNPN/IOM/MMC/BOR/FEB/2025/0090

     
     

    Request For Quotation (RFQ)

    Programs Requisition                                            Date Prepared:  17/Feb/2025

       
       
             

    Vendor Name:

     

    Vendor's Address:

                 
                 
    Mobile Number:              
    Contact Person:              
    Delivery Date:              
    Delivery Location: MMC  
       

     

    Activity Title:

     

    Budget Code:

     

    REHABILITATION OF SOCIAL AND PRODUCTIVE  INFRASTRUCTURES BASED ON COMMUNITY PREFERENCEIN SELECTED LOCATIONS (SOCIAL IMPACT PROJECT)

     
     
     

     

    ription and Specification (Be specific as possible )

     

    Unit of Measure

     

     

    Lumpsum

     

    Qty            Freq

     

     

    1                 1

     

    Est Unit Cost

     

    Est total

     

     

    NGN                                   -

     

     

    1

       

     

    2

       

     

    Lumpsum

     

    1                 1

     

     

    NGN                                   -

     

     

    3

     

    Rehabilitation of 1 Block of 3 Classrooms and Painting of 1 Block Of 2 Classrooms at

    Gidan Yara, Gidan Madara

     

    Lumpsum

     

    1                 1

     

     

    NGN                                   -

     

     

    4

     

    Rehabilitation 0f 1 Block of 2 Rooms Kitchen at Gidan Yara, Gidan Madara

     

    Lumpsum

     

    1                 1

     

     

    NGN                                   -

     

     

    5

     

    Rehabilitation of 2 Block of Toilets at Gidan Yara, Gidan Madara

     

    Lumpsum

     

    1                 1

     

     

    NGN                                   -

     

     

    6

     

    Rehabilitation of Water Point at Gidan Yara, Gidan Madara

     

    Lumpsum

     

    1                 1

     

     

    NGN                                   -

     

     

    7

     

    Rehabilitation of one Bedroom Apartment at Gidan Yara, Gidan Madara

     

    Lumpsum

     

    1                 1

     

     

    NGN                                   -

     
            Estimated Total: NGN                                   -  
    Note: Please submit your qoutation offer on or before the closingdate                                      End Date: 3/Mar/2025        
                     

     

    To be completed  byvendor

     

    Validaty period of quoatation  (in days, Weeks) :

     
     
    How many days, can you deliver after PO is received) :  
    Warrantee  Period ( In weeks or Year(s) :  
    Disclaimer: I vendor, certify that information provided by my company are true, accurate and free of error and valid  
    Name of Company Representative:  

     

     

    Signature  with company  stamp here:

     

     

    Date :                                                                                 

     

    Check how your CV aligns with this job

    Method of Application

    Quotations must be submitted in a sealed brown envelope to the designated bid box at the EYN Projects Office at Old GRA, No 1 Madura street, Old Doctors Quarters, Maiduguri, Borno State, Nigeria. Or via email to: tender@eynprojects.org with the subject line:  “ RFQ N0:  EYNPN/IOM/MMC/BOR/FEB/2025/0090 “REHABILITATION OF SOCIAL AND PRODUCTIVE INFRASTRUCTURES BASED ON COMMUNITY PREFERENCE IN SELECTED LOCATIONS (SOCIAL IMPACT PROJECT) ”

    Build your CV for free. Download in different templates.

  • Apply Now
  • Send your application

    View All Vacancies at Ekklesiyar Yan'uwa a Nigeria (... Back To Home

Subscribe to Job Alert

 

Join our happy subscribers

 
 
Send your application through

GmailGmail YahoomailYahoomail