TASKS TO BE ACCOMPLISHED (SCOPE OF WORK);
The contractor will be required to implement the following tasks;
IV.GENERAL SPCIFICATIONS
C: METHODOLOGY AND THE ASSIGNMENT DURATION.
All the works shall be completed within the duration stated by the awarded contract. The contractor should inform the client of any circumstance specifically force majeure should it seem to affect contractor’s project implementation. Any other delays will make the contractor liable to the penalty equivalent to 0.1% of the total contract sum for each calendar day of delay.
Any changes or activity not included in the construction documents that deemed necessary should be approved by MDF prior execution
The contractor is not allowed to subcontract or in any way work contrary to MDF standards.
See the complete RFP on Goole Drive Here https://drive.google.com/drive/folders/1VOT9A0xZA3EtDPnwDATDjdUoZoEYG2GQ
This job has expired. Application is no longer allowed
Note: Never pay for any training, certificate, assessment, or testing to the recruiter.
No doubt, searching for a job is a job on its own as there are loads of things you have to do to make sure you win at every stage. If you look at the whole j...
According to research, one job posting gets at least 250 applications. This means that you have at least 250 CVs to go through when you post one job vacancy. ...
Knock Knock! An amazing opportunity is here again, knocking at the door of your big dreams. Why? Because we believe your study abroad dreams are vali...
Nigerian Agip Exploration (NAE) Limited, on behalf of the NNPC / NAE PSC, is committed to the training and development of manpower as part of its Corporate Soci...
Join our happy subscribers