Subscribe to Job Alert
Join our happy subscribers
The position reports to the Bonga North Topsides Delivery Lead and will provide Mechanical Static discipline support to the engineering, procurement, fabrication, and installation/brownfield modification of all facilities; total additional topsides weight to be installed is ~1,500 metric tonnes (MT). Topside Upgrade involves installation of one new water injection turbine driven pump and an upgrade of one of the existing Bonga Main Injection pumps, addition of four new electric motor driven methanol injection pumps, addition of two corrosion inhibitor pumps, several tie-ins to existing systems, construction, installation, and integration of a new Subsea Control Building.
What you’ll be doing
What you bring
Check how your CV aligns with this job
Build your CV for free. Download in different templates.
Join our happy subscribers