Subscribe to Job Alert
Join our happy subscribers
The Nigerian National Petroleum Corporation (NNPC) is currently embarking on the construction of 40” X 614km Ajaokuta-Kaduna-Kano Gas Pipeline and Stations (AKK). The AKK Pipeline is a section of the Trans-Nigerian Gas Pipeline Network. The Segment 2 scope covering a distance of about 318.66 km of the Trans Nigeria Gas Pipeline and stations was awarded to Brentex CPP Limited for the Engineering, Procurement and Construction of Ajaokuta-Kaduna-Kano (AKK) Gas Pipeline and Stations Project.
As an equal opportunity employer, Brentex CPP Limited welcomes applications for the position below to serve on the Ajaokuta-Kaduna-Kano (AKK) Gas Pipeline Project (Segment 2) Operation:
Job Description
Required Certification & Course of Study
Skills:
Check how your CV aligns with this job
Interested and qualified candidates should send their Applications to: hr.department@brentexcpp.com using the Job Title as the subject of the mail.
Build your CV for free. Download in different templates.
Join our happy subscribers