Subscribe to Job Alert
Join our happy subscribers
Learn more about Wood Group PSN
The successful candidate will be required to produce overall shutdown level-IV Work Schedule including Manpower & progress Reports Histogram and S-curve.
To attend periodic meeting (i.e., monthly, weekly, & etc) relevant to plant shutdown as scheduled by NLNG Shutdown Coordinator/Engineer.
Detailed Description
Accountability
Principal Responsibilities
Carry out planning and scheduling activities for all stages of SDs project Life cycle. During shutdown proper to update the work progress, and reports on daily basis and attend daily progress meeting as chaired by the NLNG Shutdown Coordinator/Engineer. Identify to the shutdown Team any areas of concern, with regard to delays/slippage or may constitute a change in scope. To prepare close-out report upon completion of shutdown activities.
Job Requirements
Project management mythologies, extensive planning, project controls and scheduling experience.
Managed a multicultural and multiethnic labour and supervisory force including local nationals
Able to produce/present detailed reports.
Planning Tool, Primavera P3 & P6
Minimum of 5 years post graduation experience as a mechanical or maintenance Engineer in the oil & gas petrochemical power or mining industry. Engineering position in the oil and gas petrochemical or similar process industry.
HND or B.Sc / B.ENG Mechanical Engineering from a recognised tertiary institution.
Check how your CV matches this job
Please quote job reference IRC in all correspondence relating to this position.
Internal applicants must discuss their application with their line manager prior to applying.
Online applications only - no email applications
To apply for this position, click here
Build your CV for free. Download in different templates.
Join our happy subscribers