Serock Energy Services Limited is an engineering, procurement and construction company, incorporated in Nigeria to provide specialized services to the Oil & Gas, Power Generation, Petrochemical and Public Sector companies. Our engineering expertise is holistic not only for subsequent procurement of ... read moreequipment and the construction of any facility, but with safety and utility as priorities. This ensures once a facility is built, it will operate effectively for decades to come.
Our multi-disciplined organisation covers all phases of technical and administrative functions, needed to execute demanding engineering tasks for our clients. Over the past years, Serock has excelled in the construction industry where the company now handles turnkey projects (from design to complete construction) for both building and civil infrastructural engineering projects. Serock Energy Services Limited brings its expertise gained in composite mechanical, electrical and instrumentation projects, land and swamp pipelines as well as the fabrication of structures for both onshore and offshore sectors to fulfil your requirements with total commitment.
Requirements
Fifteen (15) years of experience in supervision of EPC Commissioning (Mech) of Power Plant project of which as Snr Commissioning Engr in at least 2 power stations development of not
Requirements
Fifteen (15) years of experience in Power Plant Island designs including development of technical requirements five (5) years of which as Snr Mechanical / Material / Welding Inspect
Job Requirements
Fifteen (15) years of experience in Power Plant Island designs including development of technical requirements, five (5) years of which as Snr Design Engineer in at least 2 powe
Requirements
Fifteen (15) years of experience in Power Plant Island designs including development of technical requirements five (5) years of which as Snr Design Engineer in at least 2 power sta
Requirements
Ten (10) years of experience in Civil / Structure of Power Plant Island designs including development of technical requirements five (5) years of which as Snr Design Engineer in at
Requirements
Fifteen (15) years of experience in Power Plant Island design including development of technical requirements five (5) years of which as Senior Design Engineering in at least 2