Subscribe to Job Alert
Join our happy subscribers
Learn how to use AI to get a job in 2025. Register for Webinar
FIRST Exploration & Petroleum Development Company Limited (FIRST E&P) is a Nigerian oil and gas company that was established in 2011. It started formal business operations on the 1st of July, 2012. FIRST E&P is a deeply technical, commercial and entrepreneurial organization, with full delivery capability across the entire upstream oil and gas value chain.
Description
FIRST E&P is in the concept phase of its gas development and commercialization programme. The gas master plan involves associated and non-associated gas gathering, upgrade of an existing offshore FPSO for gas handling capability, gas treatment and pipeline installation to connect the gas to the domestic and export market.
The Floating Gas Processing Unit (FGPU) Conversion Senior Project Engineer will be responsible for the delivery of the modifications and upgrade required for the conversion of an identified FPSO to an FGPU or conversion of identified drilling rig to a MOPU consistent with the scope requirements of the Integrated Gas Monetization Project.
The current concept comprises the procurement, conversion and installation of an FGPU or a MOPU to process and export a minimum of 300 MMscfd of gas conditioned to supply a Floating LNG (FLNG) unit. The PE will be responsible under the oversight of the FGPU Project Lead for delivering these elements of the project on schedule and within agreed budget from the pre-FEED stage through FEED, detailed engineering, installation and commissioning.
Key Accountabilities
Requirements
Build your CV for free. Download in different templates.
Join our happy subscribers