Jobs Career Advice Signup
X

Send this job to a friend

X

Did you notice an error or suspect this job is scam? Tell us.

  • Posted: Jun 25, 2014
    Deadline: Not specified
    • @gmail.com
    • @yahoo.com
    • @outlook.com
  • Never pay for any CBT, test or assessment as part of any recruitment process. When in doubt, contact us

    WTS Energy is the leading Consultant/Manpower Supply company to the international Oil, Gas and Energy industry. We supply Consultants to the Projects and Operations of our Clients. We also perform Outsourcing Services like Project Recruitment Campaigns and Workforce Management in Oil and Gas regions around the world. We operate globally with offices in 16 c...
    Read more about this company

     

    FPSO Commissioning Site Lead

    Job Code: WTABO04077
    Location: Korea, Nigeria

    Key responsibilities:

    •     Responsible for the FPSO overall commissioning.
    •     Be the focal point within FPSO commissioning team for the entities involved in the definition and preparation of the commissioning activities related to the FPSO.
    •     Ensure that all activities related to all FPSO systems commissioning are defined correctly.
    •     Review the Contractors testing and commissioning procedures, schedule, and execution plans.
    •     Identify and address all interface issues with other entities such as SPS and UFR with respect to FPSO systems commissioning activities.
    •     Ensure system and sub-system definition for commissioning takes account of the split in scope between the Korean shipyard and the yard in Nigeria.
    •     Ensure that the FPSO contractor performs all pre-commissioning and commissioning in strict accordance with the OPERCOM methodology.
    •     Ensure the sub-system definition maximizes the commissioning scope achievable at the Korean shipyard.
    •     Development of the Commissioning Methods and Strategies
    •     Assist the Commissioning Manager in the recruitment of the commissioning technicians and inspectors for the Korean shipyard phase.
    •     Organize the preparation and supervise the safe execution of the FPSO systems commissioning activities.
    •     Assist and advise the FPSO Engineering and Construction team in all FPSO commissioning issues.
    •     Ensure that the commissioning scope is identified within engineering to maximize the scope achievable at the Korean shipyard.
    •     Arrange and attend the weekly and monthly commissioning and commissioning/construction interface meetings.
    •     Ensure contractor manages the attendance of vendors satisfactorily.
    •     Manage the vendors of equipment provided by the COMPANY.
    •     Ensure the contractor adequately provides tools and spare parts for commissioning.
    •     Manage the preparation of the pre-commissioning and commissioning reporting tools.
    •     Approve contractors reporting procedures and tools.
    •     Ensure that the ICAPS database is populated correctly and that the database provides an accurate reporting tool for all pre-commissioning and commissioning activities.
    •     Ensure satisfactory definition the sub-system boundary limits and commissioning packages within sub- systems is achieved by the contractor.
    •     Ensure satisfactory definition of all FPSO systems pre-commissioning and commissioning scope within the sub-systems.
    •     Agree and approve/deny any changes proposed by the contractor to the contractors scope for commissioning and start up.
    •     Approve the contractors pre-commissioning and commissioning management procedures.
    •     Follow up and review the contractor’s preparation for pre-commissioning and commissioning scope for both onshore and offshore related to all FPSO systems equipment.
    •     Ensure contractors PTW and isolation procedures and practices are in line with Company expectations.
    •     Approve the contractors system commissioning procedures and Operational Test Procedures.
    •     Approve the FPSO systems OTPs.
    •     Witness the contractor’s performance of pre-commissioning to achieve FPSO systems completion on a sub-system basis.
    •     Approve the contractor’s punch list activities and control of punch list items including sign-off of punch list items.
    •     Witness contractor’s performance of onshore commissioning to achieve RFSU on system and sub-system basis for all FPSO systems related equipment.
    •     Approval the contractor’s pre-commissioning and commissioning dossiers.
    •     Follow up the contractor’s FAT activities at supplier premises.
    •     Assistance and follow up the contractor during off-shore installation, hook-up and commissioning and production start-up.

    Requirements FPSO Commissioning Site Lead

    •     Education: B. Eng (or equivalent) in an Engineering discipline.
    •     Professional experience: minimum 10 - 15 years working as supervision on Oil & Gas and Utility systems process equipment and systems of which 7 years specifically on Oil & Gas and Utility systems on large Oil and Gas Facilities.
    •     Minimum of 3 years in a senior supervisory role leading the commissioning of process and utility systems on an Offshore FPSO.
    •     Previous experience having worked in a Korean shipyard environment.
    •     Understanding, expert knowledge and experience of preparing commissioning strategy, developing network planning, coordinating integrated plan, contractor follow up and supervision during pre- commissioning and commissioning.
    •     Management of systems handover process and integration with project operations teams.
    •     Proven experience in pre-commissioning and commissioning of large Oil & Gas process systems.
    •     Risk analysis, Safety of persons and facilities experience and capabilities.
    •     Thorough knowledge of OPERCOM methodology and ICAPS software.
    •     Supervisory experiences and ability to manage the works of multi engineering teams simultaneously.
    •     Good presentation and communication skills, team management skills
    •     Language: Fluent in English with French an advantage. Knowledge of the Korean language an added advantage.

    Terms & Conditions FPSO Commissioning Site Lead

    •     Residential j3ject, with manpower contract renewable every 6 months.

    Method of Application

    Interested candidates should click here to apply online.

    Build your CV for free. Download in different templates.

  • Send your application

    View All Vacancies at WTS Energy Back To Home

Subscribe to Job Alert

 

Join our happy subscribers

 
 
Send your application through

GmailGmail YahoomailYahoomail