GENERAL SPCIFICATIONS
C: METHODOLOGY AND THE ASSIGNMENT DURATION.
D: TERMINATION OF THE CONTRACT
The contractor/Mason/Carpenter will be terminated from continuing performing the stated work when,
etc.
Under these circumstances,
The evaluation of the work will be done by an Engineer, the contractor will be paid as per the percentage of the work completed. For the remaining percentage of works a new contractor will be
contractually engaged (The second runner or from the available ones in an urgent situation) to finish the remaining work.
This job has expired. Application is no longer allowed
Note: Never pay for any training, certificate, assessment, or testing to the recruiter.
No doubt, searching for a job is a job on its own as there are loads of things you have to do to make sure you win at every stage. If you look at the whole j...
According to research, one job posting gets at least 250 applications. This means that you have at least 250 CVs to go through when you post one job vacancy. ...
Knock Knock! An amazing opportunity is here again, knocking at the door of your big dreams. Why? Because we believe your study abroad dreams are vali...
Nigerian Agip Exploration (NAE) Limited, on behalf of the NNPC / NAE PSC, is committed to the training and development of manpower as part of its Corporate Soci...
Join our happy subscribers