Jobs Career Advice Signup
X

Send this job to a friend

X

Did you notice an error or suspect this job is scam? Tell us.

  • Posted: Jun 29, 2015
    Deadline: Not specified
    • @gmail.com
    • @yahoo.com
    • @outlook.com
  • Never pay for any CBT, test or assessment as part of any recruitment process. When in doubt, contact us

    Neconde Started Operations Officially in December 2011. The Company currently is in a joint venture with NPDC (Nigerian Petroleum Development Company) on OML 42. This Oil Property was acquired from SPDC(Shell Petroleum Development Company) in November 2011 as a result of the Local Content Act signed into law in April 2010. OML 42 is a 814 square kilomete...
    Read more about this company

     

    Petrophysicist

    Job Description - short and topical

    • This position will provide studies and operation petrophysical support to the subsurface team. These support will be delivered through;
    • Provision of basic and advanced petrophysical analysis and studies
    • Design, planning and execution of formation evaluation programs

    Key Deliverables/KPI - SMART - Maximum 5

    • Perform petrophysical multi-well / field analysis as part of integrated subsurface studies and deliver necessary input data for static & dynamic reservoir models
    • Performing petrophysical analysis of log data (single well analysis) and assist in decision making (P&A or run casing, selection of perforation intervals, etc.)
    • Planning and preparing, in combination with reservoir engineers and geologists, routine & special core analysis (RCA & SCAL) programs to reduce uncertainties in petrophysical analysis
    • You will need to prepare and be accountable for cost effective logging programs, in order to ensure proper petrophysical evaluation of drilled wells (open & cased hole; Wireline & LWD)
    • Coordinating & supervising the logging operations and perform quality control to ensure that Contractor delivers according to contract and evaluation objectives are met

    Key Competencies - Maximum 5

    • Ability to compute and statistically analyse large data sets, and establish their geological and petrophysical dependence.
    • Advanced knowledge and experience of LWD, wireline, tools and analysis techniques. Good understanding of wireline logging operations (open and cased hole), uncertainty and its impact on evaluation techniques.
    • Field experience, drilling and monitoring of development and appraisal wells, openhole logging, mudlogging, geomechanical analysis, fault seal analysis and pressure prediction
    • Proficiency in computer based interpretation in a petrophysical software package a must and knowledge of Schlumberger TechLog software package is a big plus.
    • Must possess excellent verbal and written communication skills.

    General Knowledge, Managerial and/or Technical Skills - 5 Maximum

    • Have a mastery of well completions and down hole equipment and their functions and expert diagnosis of problems

    Education/Certification & Experience required - 5 maximum

    • A university degree in BSc degree in Physics, Petroleum Engineering, Geology or closely related disciplines, with minimum of seven years relevant experience.
    • Must posses a broad-based subsurface experience covering geoscience and reservoir engineering.
    • Candidates with experience in wireline logging field operations will be a plus.

    Method of Application

    Interested and suitably qualified candidates should click here to apply online.

    Build your CV for free. Download in different templates.

  • Send your application

    View All Vacancies at Neconde Energy Limited Back To Home

Subscribe to Job Alert

 

Join our happy subscribers

 
 
Send your application through

GmailGmail YahoomailYahoomail